2006/10/1 17:49:13
1, the Advisory
You can telephone, fax, e-mail as a way to make the initial application of intent (eg : What kinds of products for which certification, the specific models and specifications, product samples and descriptions, etc.).
We will provide you the general situation to advise you on the best certification programs made before the test documents and drawings, and other information requirements, and a preliminary estimate the associated costs. Meanwhile, we will provide you with the "application", "agents authorized notices" for completing the document.
Two applications
Please be stamped signature of the "application", "authorized agent notices" to return to Division I, prepared in accordance with requirements of relevant information;
We will be receiving these documents and information, officially accepted the application and establish projects, Meanwhile prepared, "commissioned by the certification agency agreement" (the signing of the Treaty operational certification to clear each other's duties and responsibilities. one-two).
3, signing
Please be stamped signature of the "agreement" to return to Division I, together with the "agreement" clause to pay related costs;
We received will be stamped signature of the "agreement" and the proof of payment, the designated project engineer for the project. and select the appropriate laboratory and engineers.
4, technical support (optional)
At your request, the project engineer will explain to you and your product-related standards and safety requirements; arrangements thoroughly tested and pre-screening structure; information will be translated into Chinese and English.
Above the cost of technical support level will be based on specific workloads.
5, ready for inspection
Our project engineers will timely feedback with the certifying agencies linked to the progress of the and notify you of testing or duplicative testing of the samples requirements and the exact costs, and certification bodies asked to sign a series of documents (such as certification of applications and structural parameters table, tracking service agreements, etc.).
6, censorship
Our project engineer will provide you with samples and information submitted to the cost of the corresponding certification agencies or laboratories, and timely certification project tracking the progress of the test feedback of information until the end of the project.
7, duplicative testing
If the test failed there, you can sample rectification, and sent samples again, repeat testing; could be abolished, at the ripe to re-apply.
Our engineers will be given opinions on reform, and help you sample rectification.
8, the first factory inspection or certification test before
After the start of the project, there will be certification body or its designated inspection agencies to plant your first factory inspection or certification before test (except CE ), to inspect the factory testing and production process to meet the requirements. Through the inspection, and will also have the authority or your certificate of necessity.
9, follow-up services (optional)
Since the end of the certification, we can provide you with the different requirements for the annual series of services, such as : buy labels and yellow cards, correspondence and data translation, substituting fee, the replacement of revised pages, applications and other changes. (See specific "operating performance measures"). |